ISO Certification Magnetic Iron Separator for Processing Fe/Iron/Ore/Weak Magnetic Materials

Product Details
Customization: Available
Type: Magnetic Separator
Voltage: 380V
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
12000000 RMB
Plant Area
20000 square meters
Find Similar Products

Basic Info.

Model NO.
BTK
Weight
1T
Material
Stainless Steel
Material Feature
Heat Resistant
Certification
ISO9001:2008, ISO9001:2000, CE
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
Cooling Methed
Self-Cooling
Belt Width
650-2000mm
Main Exsiting Power
5-50kw
Average Power
2-10.6kw
with of Self-Cleaning Belt
500-1800mm
After-Sales Service Provided
Engineers Available to Service Machinery Overseas
Transport Package
Steel Frame and Wood Carton
Specification
carbon steel
Trademark
Baite
Origin
Shandong, China (Mainland)
HS Code
8505119000
Production Capacity
200pieces/Year

Product Description

 
Introduction
BTK series iron separator for magnetic mineis designed by our company basing advanced technology.it consist of Electromagnetic iron removal device,Metal detector,No magnetic idler roller,Rectifier control cabinet.It can match with the conveying belt to eliminate the magnetic impurities, such as the original ore, sintered ore, pellet ore, block ore and others. It can separate ferromagnetic materials with the least mine to protect the crushers.It has a series advantages,such as with drum shape compact structure,automatic belt-off-correction feature,easy to maintain,low power consumption,it can be work in harsh environment.

Technical Feature
1.The design of the magnetic field in this system is selected based on the Optimizes Computerizes Simulation.
2.With drum shape compact structure, automatic belt-off-correction feature.
3.Easy to maintain, low power consumption.
4.With the feature of full function, manual and centralized control, it can work in harsh environment.
5. Used with metal detector to make automatic detection system without leaking iron phenomenon. 
6. Multi-level separate repeatedly to separate ferromagnetic materials with the least mine.

Structure
1. Electromagnetic iron removal device: the main magnetic field is composed of the main magnetic pole, the main magnetic pole adopts electromagnetic type, the secondary magnetic pole adopts electromagnetic or permanent magnetic type. The iron discharge method is automatic unloading. The mounting mode is mounted and seated.
2. Metal detector: HTK magnetic iron ore removal and metal detectors are used in conjunction with metal detectors, and the ability to absorb iron from the main magnetic system to the secondary magnetic system should be reduced in turn.
3. No magnetic idler roller: no magnetic roller should be selected under the main magnetic pole.
4. Rectifier control cabinet: the special belt type electromagnetic except iron, metal detector and rectifying control cabinet form the magnetic.

Work Principle
BTK magnetic iron removal system transports materials on the conveyor, the metal detector installed in the front, BTK special magnetic iron separator is behind metal detector.The non-magnetic splitter platform is connected with the iron parts that are sucked out after the iron bar.The rectifier control cabinet is connected with the metal detector and the special belt electromagnetic iron remover. When the metal detector detects the iron materials,the alarm is set off. The signal is sent to the rectifier control cabinet. The control cabinet starts the belt type except iron and excitation. In the main magnetic pole, the iron parts and some of the more magnetic materials are also sucked up. Through the rotation of the discharging iron straps backward movement, due to the magnetic ore and iron on the shape and magnetic have very big difference, so the magnetic separation after sorting through three times in the area, most of the magnetic ore fall onto the conveyor belt, a small amount of material with iron to non-magnetic materials were separated to platform.After four times it reached a good effect.
Application
It can match with the conveying belt to eliminate the magnetic impurities, such as the original ore, sintered ore, pellet ore, block ore and others. It can separate ferromagnetic materials with the least mine to protect the crushers.

Technical data
NO. Model Cooling method width of conveyor belt(mm) mean
power (≤kw)
Main
existing power    
(≤kw)
Ancillary
existing
power
(≤kw)
Width
of
Unloading
iron
Belt(mm)
driving
power(kw)
Model
of
metal
detector
1 BTK-6 self-cooling 600 2.0 5.0 4.8 500 3.0 GJT-650
2 BTK-8 800 3.0 9.0 7.5 650 4.0 GJT-800
3 BTK-10 1000 4.6 13.0 10.8 800 5.5 GJT-1000
4 BTK-12 1200 5.0 18.0 15.0 1000 5.5 GJT-1200
5 BTK-14 1400 6.5 25.0 18.0 1200 7.5 GJT-1400
6 BTK-16 1600 8.0 32.0 27.0 1400 11.0 GJT-1600
7 BTK-18 1800 9.5 45.0 36.0 1600 15.0 GJT-1800
8 BTK-20 2000 10.6 50.0 42.0 1800 15.0 GJT-2000
Packaging & Delivery
Shipped in 30 days after payment.
Company & Customer Visiting
chinamagnet.en.made-in-china.com

There is no better , only better.
Weifang baite Magnet Technology Co., Ltd . is a modern joint-stock enterprise, which is producing magnetic and power equipment .The service is related to more than 10 areas ,such as electricity , coal ,building materials, metallurgy ,ports ,mining ,nonferrous metals ,power environmental production .At present ,we  have provided more than 3000 domestic customers with reliable and value-added and convenient professional equipment and programes, and at the same time ,we occupy more than 60%magnetic separation equipmemt matching share of China ball mill, crusher, iron sand ship and other production industry, Baite has firmly implemented IS09001:2000 international quality magnagement system standard and IS010012 international quality inspection system standard.


Factory Advantages & Service
Baitemagnet factory for general users and special users design and production of various types of customized products.The company owns 3, 000 square meters of mine machinery production plant in linqu area of weifang, and each product has a separate workshop to assemble specialized production workers.Most of our products are self-developed products, combining with advanced technology at home and abroad to ensure that the industry is competitive and fully meets the technical requirements of customers.Our production capacity is strong, and we have a special production line for customers who are in urgent need of the goods.
We are full of enthusiasm, high quality service, think the customer value is the principle. Provide the spare parts and vulnerable parts of the products at the factory price.
Once the equipment failure in the process of production, the company within 24 hours to the customer's phone must come up with a clear solution, and to resume production first and then the responsibility attitude quickly solve the problem.



FAQ
1.Q: Can you provide samples?
A: Yes. We can make customized samples to you for quality checking and design confirmation.
2.Q: How long is the warrenty of your equipments? Does your company supply the spare parts?
A: The warranty period of Gelin equipments is one year. And of course we will supply the spare parts for you for life-long time at lowest cost.
3.Q: How to make the payment? 
A:we accept the payment by T/T or Western Union or Cash, L/C .For T/T, the customer can choose 100% in advance or 30% in advance, and pay the 70% balance before shipment. 
4.Q: What is the shipping port?
A: Usually we ship from Qingdao port. If you want to ship from another port we can coordinate with you.
5.Q: What is the lead time?
A: 30-45 days after payment and production drawing confirmation.
6.Q: What is your MOQ?
A: Normally 1 piece is acceptable. Please consult with our sales for details.












 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier