Customization: | Available |
---|---|
Type: | Ozone Water Purifier |
Usage: | Chemical Industry, Mining |
Still deciding? Get samples of US$ 500/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Our GYM series Permanent magnetic vacuum filter is specially used for magnetite concentrate dewatering.Its feeding chute is on the top of the drum. There is permanent magnetic material in the drum, thus can make the magnetic particles absorbed to the surface of the filtering cloth quickly.
Overall Dimension Drawing:
Model | GYW-3 | GYW-5 | GYW-8 | GYW-12 | GYW-20 |
Filtering area (M2) |
3 | 5 | 8 | 12 | 20 |
Cylinder diameter (mm) |
1600 | 2000 | 2000 | 2000 | 2400 |
Cylinder length (mm) |
700 | 900 | 1400 | 2000 | 2850 |
Roller rotating speed (r/min) |
0.5-2.0 | ||||
Blast pressure(continue) (KPa) |
60-80 | ||||
Suckig rate (m³/min.M2) |
0.5-2.0 | ||||
Magnetic induction density (mT) |
80 | 90 | |||
Feeding concentration (%) |
≥60 | ||||
Capacity(t/h) | 6-9 | 14-18 | 22-43 | 33-65 | 64-108 |
Residue water content (%) |
8-10 | 8-10 | 8-10 | 8-10 | 8-10 |
Size (mm) |
1895×2506×2087 | 2110×2755×2500 | 2610×2905×2500 | 3210×2905×2500 | / |
Weigh (t) |
3.27 | 3.94 | 4.76 | 5.42 | 7.9 |
Motor mode | Y100L-6 | Y112M-6 | Y132M1-6 | ||
Driving Power (kw) |
2.2 | 3 | 4 | ||
Motor rotating speed (r/min) |
940 | ||||
Vacuum pump power (Kw) |
22 | 30 | 37 | 55 | 75 |
Exhibition in Indonesia
Q: Are you a factory ?
A:Yes,we are factory, which was established in 2003.
We focus on providing expert service including design, manufacture, installation & maintenance.
Q: Terms of Payment:
A:30% of the total amount by TT as deposit, the balance to be paid by TT or L/C at sight before the machines leaving seller' factory.
100% irrevocable L/C at sight.
Q:Time for preparation of goods:
A:The above machines shall be ready for delivery during 25 days from the date of receiving the deposit/LC, excluding the time of waiting for shipment.
Q:Guarantee period:
A:The guarantee period for the above machines is twelve months from the date of putting into use, but not exceeds twenty-four months after the machines leaving seller's factory. It is not applicable for quick wear parts.
Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. Every step will be send to you in time.
Q: Can I customize shelving or racking at my own size?
A: Sure.
Q: If i need the complete mineral processing line. is Baite able to help us build it?