Series Rcdeb Oil Forced Circulation Cooling Electromagnetic Separator

Product Details
Customization: Available
Type: Magnetic Separator
Voltage: 380V
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
12000000 RMB
Plant Area
20000 square meters
Find Similar Products

Basic Info.

Model NO.
RCDEB
Weight
5T
Material
Stainless Steel
Material Feature
Dust-Prrof
Certification
ISO9001:2008, ISO9001:2000, CE
Energy Saving
Energy Saving
Warranty
1 Year
Color
Customized
Customized
Customized
Condition
New
Dimension
Customized
Capacity
0.5~200tph
After-Sales Service
Engineers Available Overseas
Cleaning Way
Manual Cleaning
Adaptive Belt Speed
Max 4.5 M/S
Cooling Way
Oil-Cooling
Transport Package
Polywood and Steel Frame
Specification
stainless steel
Trademark
BAITE
Origin
China
HS Code
84741000
Production Capacity
10000

Product Description

Introduction:
For the port of coal transportation, big thermal power plant, mine and building material. It can also work in the harsh environment such as dust, humidity, salt fog.
Features:
-- High-quality cooling oil and optimized oil circulating design.
--  No noise, quick heat releasing, low temperature rising.
--  Compact structure, easy maintenance, reliable and longtime trouble-free operation.
-- The coils have unique features like anti-oxidation, anti-rust and good insulation.




 Technology Characteristics:
--  Absorbing the advanced oil forced circulation technology for the large or medium transformer both home and abroad, it features with low temperature (≤40°C) rising and the technology is reliable and safety.
-- Magnetic route is short, magnetic waste is less, the gradient is high and removing iron efficiently.
--  Light weight reasonable oil line, compact cooling structure and high heat-releasing efficiently.
--  The exciting coil is completely dipped into the transformer oil to be dust-proof, moisture-proof and anti-corrosion.
--  Made three-dimensional excitation coil winding, the area for heat releasing is large to control the temperature (≤40°C) for long service life. 

 
Overl Dimension Drawing:
Technical Parameters
NO. Model conveyor
 belt width 
 (mm)
Suspension 
height
(h=mm)
Magnetic 
intensity
(≥mt)
Belt 
speed
(m/s)
Existing
 power
 (≤kw)
Condenser
 power 
(≤kw)
Weight
(kg)
Appearance
 size     
  (mm)
1 RCDEB-10 T1 1000 300 90 ≤5.8 6.5 0.25 2600 1700×1210
T2 120 9.5 0.25 2950 1700×1250
T3 150 15.0 0.25 3470 1750×1280
2 RCDEB-12 T1 1200 350 90 9.0 0.25 2900 1750×1280
T2 120 14.0 0.25 3500 1750×1280
T3 150 20.0 0.25 5400 2000×1380
3 RCDEB-14 T1 1400 400 90 14.0 0.25 3000 1750×1280
T2 120 20.0 0.25 5500 2000×1420
T3 150 29.0 0.25 7460 2230×1450
4 RCDEB-16 T1 1600 450 90 18.0 0.25 5400 2000×1420
T2 120 28.0 0.25 7500 2230×1450
T3 150 32.0 0.25 8550 2350×1480
T4 175 52.0 0.75 10200 2570×1550
T5 200 70.0 0.75 11875 2570×1600
T6 225 85.0 1.1 14250 2570×1650
T7 250 104.0 0.55×2 15500 2570×1720
5 RCDEB-18 T1 1800 500 90 26.0 0.75 7600 2250×1480
T2 120 32.0 0.75 8600 2350×1480
T3 150 40.0 0.75 10500 2460×1500
T4 175 56.0 0.75 14600 2600×1600
T5 200 75.0 0.75 17600 2650×1650
T6 225 90.0 1.1 18500 2700×1700
T7 250 107.0 0.55×2 19200 2750×1720
6 RCDEB-20 T1 2000 550 90 30.0 0.75 8800 2400×1480
T2 120 39.0 0.75 10600 2500×1500
T3 150 41.0 0.75 12500 2660×1500
T4 175 70.0 0.55×2 21600 2750×1620
T5 200 83.0 0.55×2 22500 2820×1650
T6 225 104.0 0.55×2 23900 2870×1680
T7 250 125.0 0.55×2 25600 2900×1750
 

FAQ
Q: Are you a factory ? 
A:Yes,we are factory, which was established in 2006.
We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & warehouse equipment.
Q: Terms of Payment:
A:30% of the total amount by TT as deposit, the balance to be paid by TT or L/C at sight before the machines leaving seller' factory.
100% irrevocable L/C at sight.
 Q:Time for preparation of goods:
A:The above machines shall be ready for delivery during 45 days from the date of receiving the deposit/LC, excluding the time of waiting for shipment. If there is any delay of delivery caused by seller, 3‰ of the total amount shall be paid to buyer each day, but this amount shall not exceed the amount of deposit; if the delay is caused by buyer, 3‰ of the total amount shall be paid to seller each day, but this amount shall not exceed 10% of total value of machines.       
 Q:Guarantee period:
   A:The guarantee period for the above machines is twelve months from the date of putting into use, but not exceeds twenty-four months after the machines leaving seller's factory. It is not applicable for quick wear parts.
Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. Every step will be send to you in time.
Q: Can I customize shelving or racking at my own size?
  A: Sure.
Q: If i need the complete mineral processing line. is Baite able to help us build it?

A: Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service. 

Why Choose us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.

3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement.   
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4.2 If there is any equipment failure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4.3 Beyond the guarantee period, the seller can provide services and fittings at a most preferential price. 
4.4The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.  
5.Package & Ship:
Work Shop View:




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier